Prong scaffold E-507 (Non-bolt tubular scaffold for stone, painting and decorating) are intended for a laying of stone walls in height up to 40м, and for furnish of facades of buildings up to 60м. Woods are executed according to GOST 27321-87. Connection of woods without application of bolts.
Image, designation |
The name | Overall dimensions, mm. |
Weight, kg. |
Л-1 |
Support | 4000 | 22,69 |
Л-2 |
Support | 2000 | 11,92 |
Л-4 |
Boot | 4,3 | |
Л-5 |
Connection | 2400 | 10,26 |
Л-6 |
Collar | 1900 | 9,91 |
Л-9 |
Collar | 1500 | 6,88 |
Л-17 |
Ladder | 2415x435 | 15,5 |
Л-13 |
Double hook | 3,49 | |
Л-14 |
Single hook | 1,28 | |
Л-15 |
Anchor | 0,23 | |
Wood board |
Woods probably to get as the complete set, and by set. In addition the customer can get a wood floor (0,5х1,6) t=40мм.
In a variant of assembly of scaffold for painting and decorating the floor can be gathered on six stages. People elevate on scafold is carried out on ladders. The top end of ladders on hooks is hung on cross-beams, and bottom leans on a floor.
Rigidity of scaffold is provided with installation of the diagonal communications connected to supports. Diagonal communications are established in two extreme flights.
Protections are established on working stages of scaffold except for floorings.
For protection against atmospheric electric categories of a scaffold are equipped with the grounding connected to a support by the trunk.
Scaffold as a variant of assembly for stone works are gathered from elements of scaffold for painting and decorating. Distinction consists that fastening of scaffold for stone works to a wall is carried out by the mortgages pawned in a wall during a laying. Also distinction is in that the floor can be gathered only on two stages from boards for a stone laying.
Indicator | Units | For a stone laying | For painting and decorating |
Limiting height | m. | 40 | 60 |
Step of a stage | m. | 1,0 | 2,0 |
Step of supports along a wall | m. | 2,0 | 2,0 |
Distance between supports to perpendicularly wall | м. | 1,6 | 1,6 |
Quantity of stages of the floor, simultaneously stacked on scaffold | шт. | 2 | 6 |
Normative superficial loading | kg/m2 | 250 | 200 |
Pipe | mm. | 48х3,5 и 57х3,5 |
Setting saddle scaffold for finishing and stone works represent a construction collected from following elements: a frame, a frame with a ladder, diagonal draft, horizontal draft, face projection, daises, anchor elements fastenings to a wall.
The bottom number of frames supports on boots.
Frames (with ladders) and frames (without ladders) are increased one after another up to necessary height.
Frames with ladders are installed in the second and third number from edge of scaffold from double-side and serve for elevate of workers on a working stage.
Frames, with the purpose of stability, communicate among themselves diagonal and horizontal communications in chessboard order from street and communications horizontal from a wall. In scaffold for a stone laying in a penultimate stage diagonal drafts are installed in each flight.
Fastening of scaffold to a wall is realized through anchors.
Scaffold can be got as the complete set, and each element. As a base under a wooden flooring can serve: a skeleton metal (the size 1,0х3,0, it is executed from a pipe 50х25х2,0) or collar -2 pieces (3м, is executed from a pipe 48х3,5).
Image, Notation | The name | Overall dimensions, mm | Mass, kg. |
Р-01 |
Frame with a ladder | 2080x1062 | 13,4 |
Р-02 |
Frame without a ladder | 2080x1062 | 11,1 |
Р-03 |
Boot (supporting abutment) | 100x100x103 | 0,36 |
Р-04 |
Face projection (extra) | 1140x45x80 | 1,4 |
Р-05 |
Diagonal communication | 3287 | 6,3 |
Р-06 |
Horizontal communication | 3050 | 2,93 |
Р-07 |
Fastening to a wall (an anchor, a fuse) | 0,25 | |
Р-08 |
Collar (extra) | 3060x65 | 11,9 |
Р-09 |
Floor | 3060x500x50 | 23 |
For protection against atmospheric electric charges of a scaffold are equipped lighting receiver and grounding.
Indicator | Units | For painting and decorating | For stone works |
The maximal height of scaffold | m. | 30 | 20 |
Step of a stage | m. | 2,0 | 2,0 |
Step of frames along a wall | м. | 3,0 | 2,0 |
Width of a stage (pass) between post of frames | m. | 1,1 | 1,1 |
Stage quantity of the floor simultaneously stacked on scaffold | шт. | 2 (top) | 2 (top) |
Normative superficial loading | Pa (kgf/m2) | 200 | 200 |
Fastening between elements is carried out by rotary and deaf clamps - can be applied to buildings of a complex configuration both by way of, and on height, and also at the inclined bases. The construction clamp scaffold allows to change over a wide range schemes of a skeleton depending on an outline of a building. They are intended for finishing and repair work on facades of buildings in height up to 40 m, and also for a stone laying of walls of buildings in height up to 20 m.
The joints of supports should be in different levels with the purpose of stability increase of scaffold, within the limits of the first both uppermost stage two-meter and four-meter supports alternate. Scaffold is increased only by four-meter racks in intermediate stage Supports are incorporated by clamps to communications and cross-beams. Cross-beams are incorporated to the fuses, mounted in a facade of the repaired building. The floor on stage of scaffold is gathered from the wooden boards, made of wood of coniferous breeds. Floor boards are established on communication.
Floor can be gathered in all stage in a variant of assembly of scaffold for painting and decorating. People elevate on scaffold is carried out on ladders. The top end of ladders on hooks is hung on cross-beams, and bottom leans on a floor.
Rigidity of woods by the way is provided with installation of the diagonal communications connected to supports by rotary clamp. Diagonal braces are established in two extreme flights of scaffold.
Board planking and protections are established on working stage of scaffold except for floor. Board planking are fixed by cramp - protections by clamps. Scaffolds are equipped with the grounding connected to a support by the trunk for protection against atmospheric electric categories.
Scaffold as a variant of assembly for stone works - are gathered from elements of scaffold for painting and decorating. Distinction consists that fastening of scaffold for stone works to a wall is carried out by the mortgages, pawned in a wall during a laying. Also distinction is in that the floor can be gathered only on three stages from boards for a stone laying.
Scaffold probably to get as the complete set, and by set. In addition the customer can get a wood floor (0,5х2,0) t=25мм.
Indicator | Units | For painting and decorating | For stone works |
The maximal height of scaffold | m. | 40 | 20 |
Step of a stage | m. | 2,0 | 1,0 |
Step of frames along a wall | m. | 2,5 | 1,5 |
Width of a stage (pass) between supports of frames | m. | 1,25 | 1,4 |
Quantity of stage of the floor, simultaneously stacked on scaffold | items. | 19 | 3 |
Normative superficial loading | Pa (kgf/m2) | 200 | 250 |
Pipe | mm. | 48х3,5 |
Links:
[1] http://remstroy.info/media/products/lesa507/main.jpg
[2] http://remstroy.info/media/attachments/OTZYV_O_RABOTE_IZDELIYa_2.doc
[3] http://remstroy.info/media/attachments/Dilleram-reklamnyy_list_2.pdf
[4] http://remstroy.info/media/products/lesa200/main.jpg
[5] http://remstroy.info/media/attachments/OTZYV_O_RABOTE_IZDELIYa_3.doc
[6] http://remstroy.info/media/attachments/Dilleram-reklamnyy_list_3.pdf
[7] http://remstroy.info/media/products/lesa40/main.jpg
[8] http://remstroy.info/media/products/lesa40/conn.jpg
[9] http://remstroy.info/media/products/lesa40/homut_pov_sch.JPG
[10] http://remstroy.info/media/products/lesa40/homut_gluhoy_sch.JPG
[11] http://remstroy.info/media/attachments/OTZYV_O_RABOTE_IZDELIYa_4.doc
[12] http://remstroy.info/media/attachments/Dilleram-reklamnyy_list_4.pdf